PILE ELBUD S.A. also carries out investments in such an important power engineering segment as renewable energy sources. The Company is currently building two kV cable lines for wind farms:
Jasna WF 110 kV line from the compensation station to Jasna wind farm substation with a total length of 35 km
15 km-long Pomerania WF 110 kV line, connection of the line to Elbląg Radomska distribution substation
Execution of cable conduits with the use of traditional and trenchless methods under the roads and crossing structures.
Laying a single-circuit cable line in pre-prepared cable trenches and conduits with protective composite panels, protective foil and additional protective elements at crossings with the existing underground infrastructure.
Installation of cables and cable accessories.
Connection of the cable line to the structures of cable heads in the substation, installation of the heads.
Laying ducting system for fibre-optic cable over the entire length of the cable line, pulling the fibre-optic cable, mounting the trays, preparing reserves.
reconstruction of sidewalks, walking alleys, bicycle paths, driveways, parking lots, etc.
restoration of green areas to their original state