PROJECT STATUS
EMPLOYER
CATEGORY
PROJECT DURATION
The project is related to the planned Ostrołęka Power Plant C and will serve as a connection to the Ostrołęka 400/220/110kV substation. As part of the project, a single-circuit 400kV overhead line was constructed and a 110kV overhead line transitioning into a 440 metre-long cable line.
The new section of the line was made comprehensively - from the foundations, through the construction of poles, to the installation of conductors.
The designed 110kV cable line will constitute a backup power supply section for general needs of Ostrołęka Power Plant C.